An old, industrial-sized motor and a rusted out 1,500 gallon fuel tank were just a few of the big ticket items pulled out of the ground at the new Sam’s Club site in Warwick off of Bald Hill Road.
The site is now under the watchful eye of the Environmental Protection Agency.
The NBC 10 I-Team discovered documents filed by the EPA alleging “at some unknown time prior to August 20, 2012, PCB contaminated material was disposed of at the site by an unknown entity. The debris included metal scrap, electrical equipment, concrete and wood, along with steel tanks.”